Flight Assembled Architecture

Swiss architects Gramazio & Kohler and Raffaello D’Andrea are a fully automated construction project at the FRAC Centre in Orléans, France that uses flying robots to assemble a six meter high tower constructed of 1500 polystyrene foam bricks. The exhibit lasts from up to February 19, 2012. The same team previously used a robot called "R-O-B" to build a looping wall in New York and the award-winning Structural Oscillations installation at the 2008 Venice Architecture Biennale.

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

Mitsubishi Electric Automation, Inc. - BEST INITIAL WARRANTY – 3 YEARS FOR ALL NEW REGISTERED ROBOTS

Mitsubishi Electric Automation, Inc. - BEST INITIAL WARRANTY - 3 YEARS FOR ALL NEW REGISTERED ROBOTS

Registering your Mitsubishi Electric Automation robot unlocks the full potential of Mitsubishi Electric Automation's industry-leading three year cleanroom or on-site service initial limited warranty for robots purchased on or after October 1, 2014.